Installation

Sequence and Steps​

Customer Needs Communication and Discussion

Communication and discussion about customer needs, equipment specifications, site environment, and other factors.

On-Site Survey and Measurement Assessment

Conducting an on-site inspection and measurement to evaluate the Baby Clean Room.
Using a particle counter to measure the cleanliness and air tightness of various areas for the Baby Clean Room assessment.

System Design Engineering

Arranging on-site surveys and measurements according to plans, collecting parameters.
Designing the system and evaluating equipment specifications based on customer needs.

Turnkey Engineering

Equipment setup and installation, secondary piping (installation), construction management, and conducting indoor PM and CO2 concentration safety checks. Monitoring outdoor environmental data and testing to meet Baby Clean Room standards.

Management Services Engineering

Standard verification, equipment maintenance, consumable updates, system updates, and after-sales service.

 

Information

Address

8, No. 51, Section 4, Zhongyang Rd, Tucheng District, New Taipei City, Taiwan 236

Contact Us

+886-2-7715-8588
+886-2-2269-3902
service@addwii.com