Installation
Sequence and Steps
Customer Needs Communication and Discussion
Communication and discussion about customer needs, equipment specifications, site environment, and other factors.
On-Site Survey and Measurement Assessment
Conducting an on-site inspection and measurement to evaluate the Baby Clean Room.
Using a particle counter to measure the cleanliness and air tightness of various areas for the Baby Clean Room assessment.
System Design Engineering
Arranging on-site surveys and measurements according to plans, collecting parameters.
Designing the system and evaluating equipment specifications based on customer needs.
Turnkey Engineering
Equipment setup and installation, secondary piping (installation), construction management, and conducting indoor PM and CO2 concentration safety checks. Monitoring outdoor environmental data and testing to meet Baby Clean Room standards.
Management Services Engineering
Standard verification, equipment maintenance, consumable updates, system updates, and after-sales service.
Information
8, No. 51, Section 4, Zhongyang Rd, Tucheng District, New Taipei City, Taiwan 236
+886-2-7715-8588
+886-2-2269-3902
service@addwii.com